The IRFM is looking for an Engineer in the frame of an EUROfusion Engineering Grant (subject: Engineering support on ITER wall conditioning) In the coming years, ITER operation will have a growing focus on (integrated) commissioning and wall conditioning leading to its first plasma operation. The design of the ITER Glow Discharge Cleaning (GDC) system is currently under development and could strongly benefit from the commissioning and operational experience of presently operating devices. The WEST facility at CEA-Cadarache (close to ITER), a superconducting machine equipped with a tungsten wall, offers an excellent test-bed to develop conditioning strategies, and expertise as well as to engineer ITER-relevant equipment(s) in collaboration with the ITER team. Selection process
Duration of the Contract: 3 years |
||
SG165549, 2021-08-31
|